S.No. District Local Level Incident Incident Date Death Male Death Female Death Unknown Total Death Missing People Affected Family Estimated Loss Injured Govt. Houses Fully Damaged Govt. Houses Partially Damaged Private House Fully Damaged Private House Partially Damaged Displaced Male(N/A) Displaced Female(N/A) Property Loss Incident Place Damaged Houses(%) No. of Displaced Family Cattles Loss Displaced Shed Office Remarks
17751 Panchthar Yangwarak Rural Municipality Flood 2023-06-15 0 0 0 0 0 2 0 0 0 0 0 0 0 0 Barme 0 0 0 1 Nepal Police. Tharkaman Rai / Parshuram Pyakurel
17752 Taplejung Meringden Rural Municipality Landslide 2023-06-15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Khurpathak 0 0 0 0 Nepal Police. The dam of Mewakhola United Hydro Power, which is being built by Ramechhap Construction, has damaged approximately 40 meters of the wall of the dam in Mewa river.
17753 Taplejung Sirijangha Rural Municipality Flood 2023-06-15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Yamphudin 0 0 0 0 Nepal Police. Due to the flood in the Kabeli river, the building of the police station at Yamfudin is at risk.
17754 Pyuthan Swargadwari Municipality Fire 2023-06-15 0 0 0 0 0 1 0 0 0 0 0 0 0 0 Naya Gaau 0 0 0 1 Nepal Police. Kamal Bhandari
17755 Panchthar Hilihang Rural Municipality Heavy Rainfall 2023-06-15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Kholakharka 0 0 0 0 Nepal Police. Caused damage to Kabeli A hydropower (37.6 MW) project.
17756 Taplejung Sidingba Rural Municipality Flood 2023-06-15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Tawakhola - Tawa/Nigure 0 0 0 0 Nepal Police. The Zholunge bridge connecting Tawa and Nigure & the suspension bridge connecting Tindulpokhri from Yangmachour was completely swept away by the flood.
17757 Panchthar Hilihang Rural Municipality Heavy Rainfall 2023-06-15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Bansbote 0 0 0 0 Nepal Police. Damage to Arun Valley Hydropower
17758 Lamjung Besishahar Municipality Landslide 2023-06-14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Udipur 0 0 0 0 Nepal Police. Dumre Besishahar road section was completely blocked due to the rain & landslide that fell from the top of the road.
17759 Kavrepalanchowk Roshi Rural Municipality Heavy Rainfall 2023-06-14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Kaldhunga 0 0 0 0 Nepal Police. Due to the incessant rains that fell in the night on the BP highway, the road was blocked on both sides by the ledho that came to the Khahare River.
17760 Kapilbastu Maharajgunj Municipality Fire 2023-06-14 0 0 0 0 0 1 70000 0 0 0 0 0 0 0 0 Nanmahara 0 0 0 1 Nepal Police. Ram Niwas Kurmi
Total 6673 7087 42 16196 1365 245922 54210295790 39865 2723 3914 843870 406537 260009 1 0